UK-manufactured access solutions with fast lead times, competitive trade pricing, and the compliance documentation you need for Building Control sign-off and project handover.
Main contractors require an access panel and riser door supplier who can deliver the right products, to the right specification, on time and with full compliance documentation. This means fire-rated products tested to BS EN 1634-1 with certificates that satisfy Building Control, acoustic and smoke ratings where the specification demands it, competitive pricing for both standard and bespoke sizes, and reliable lead times that match the construction programme.
A complete handover documentation pack including test evidence, declarations of performance, and installation records is essential. The supplier must be a manufacturer — not a reseller — to maintain quality control, offer bespoke sizing, and respond quickly when project requirements change.
As a main contractor, you are managing programme, cost, quality, and compliance simultaneously. Access panels and riser doors are a relatively small line item on most projects, but they can cause disproportionate problems when they go wrong.
Late specification changes from the design team mean access products are often among the last items to be procured. When the drylining subcontractor is ready to close up walls and the access panels have not arrived, the knock-on effect ripples through the programme. Resellers who do not hold stock and rely on third-party manufacturers add an additional link in the chain — and additional risk. Compliance documentation is equally time-critical. Building Control officers increasingly require fire test certificates, declarations of performance, and evidence that the installed product matches the tested configuration. When this documentation is incomplete or unavailable at sign-off, it creates delays to practical completion and impacts your handover programme.
Value engineering is a constant consideration, but substituting access products without understanding the specification can create problems. A non-fire-rated panel installed in a fire-rated wall is a compartmentation breach. An acoustic panel that does not meet the dB requirement creates a post-completion defect. Working directly with the manufacturer eliminates these risks.
Standard products dispatched within 24–48 hours from our Nuneaton manufacturing facility. Bespoke sizes within 5–10 working days. We hold stock of our most popular sizes and configurations, and we manufacture everything under one roof — no reliance on third-party suppliers.
Direct-from-manufacturer pricing with no reseller markup. Volume discounts available for large projects. We provide detailed quotations against your door schedule within 24 hours, with fixed pricing for the duration of your project.
Every order is supplied with fire test certificates, declarations of performance, technical data sheets, and installation guidance. For large projects, we prepare bespoke handover documentation packs that align with your O&M manual requirements and support Building Control sign-off.
For multi-phase projects, we can hold stock and deliver on a call-off basis to match your construction programme. Delivery schedules are agreed in advance and coordinated with your site logistics team to avoid storage issues and double handling.
When the specification calls for non-standard sizes, we manufacture to your exact requirements. No minimum order quantities. Our design team can also advise on product selection and configuration when the original specification is performance-based rather than prescriptive.
When installation queries arise, our technical team is available by phone or on-site to resolve issues quickly. Our on-site technical support service provides installation verification and guidance for complex or high-profile projects.
Fire-rated walls and ceilings. 24–48hr (standard), 5–10 days (bespoke).
Services risers in residential and commercial. 24–48hr (standard), 5–10 days (bespoke).
General access in non-fire-rated areas. 24–48hr.
High-volume residential — fast installation. 24–48hr.
Gas and electric meter enclosures. 24–48hr.
Roof void access. 24–48hr.
Send us your door schedule and we will return a detailed quotation within 24 hours. Direct-from-manufacturer pricing, fast lead times, and full compliance documentation — everything you need to keep your programme on track.