Replacement, retrofit, and upgrade access panels, riser doors, and loft hatches — from a UK manufacturer with fast dispatch and the fire compliance evidence your building needs.
Facilities managers require access panels, riser doors, and loft hatches that provide reliable, long-term maintenance access to concealed building services while maintaining fire compartmentation, acoustic separation, and security. In existing buildings, this often means replacing damaged, missing, or non-compliant access products as part of planned maintenance programmes, fire safety upgrades, or compartmentation remediation works.
Replacement products must match the fire rating and performance requirements of the original specification, fit the existing structural opening, and be available quickly to minimise disruption to building occupants. For retrofit applications, picture frame profiles allow installation into finished walls without disturbing the surrounding surface.
Managing access products across an existing building portfolio presents different challenges to new construction. Access panels get damaged through daily use, removed during maintenance work and not replaced, or were never fire-rated in locations where compartmentation is now required following a fire risk assessment update.
The Building Safety Act 2022 and the Fire Safety (England) Regulations 2022 have increased the regulatory obligations on building owners and responsible persons. Compartmentation surveys frequently identify riser doors and access panels that are damaged, incorrectly rated, or missing entirely — particularly in residential blocks, social housing, and commercial buildings constructed before current standards were adopted.
Sourcing replacement products for existing buildings adds further complexity. Original products may be discontinued, the manufacturer may no longer exist, or the exact specification may be unknown. Structural openings vary in size and may not match standard catalogue dimensions. For occupied buildings, installation work must be planned to minimise disruption, and products must be available quickly to close out remediation programmes.
Our picture frame profile is designed specifically for retrofit installation into finished walls — no need to disturb the surrounding surface. We manufacture to exact dimensions to fit existing structural openings, even when they do not match standard sizes.
When a compartmentation survey identifies access panels or riser doors that need upgrading to fire-rated products, we provide the certified replacements with full test evidence. Our technical team can review your survey findings and recommend the appropriate fire-rated product for each location.
Standard products dispatched within 24–48 hours. Bespoke sizes within 5–10 working days. We understand that remediation programmes often have regulatory deadlines, and we prioritise orders accordingly.
Every fire-rated product is supplied with BS EN 1634-1 test certificates, declarations of performance, and installation guidance — giving you the documentation needed to demonstrate compliance to your responsible person, Building Control, or the Fire Risk Assessor.
For large-scale replacement programmes, our on-site technical support team can survey existing access points, assess replacement requirements, and produce a schedule of replacement products with specifications and quantities.
For housing associations, local authorities, and facilities management companies managing multiple buildings, we offer portfolio supply agreements with fixed pricing, priority dispatch, and dedicated account management.
Retrofit into finished fire-rated walls. No disturbance to surrounding surface.
Replacement services riser access. Bi-directional fire testing, 60 & 120 min.
General maintenance access replacement. Budget lock, fast dispatch.
Replacement gas and electric meter enclosures. External and bespoke options.
Part L compliant roof void access. Thermal performance upgrade.
Protected corridors and escape routes. BS EN 1634-3 tested.
Whether you are upgrading fire safety, replacing damaged panels, or running a portfolio-wide remediation programme — we can help. Fast dispatch, bespoke manufacturing, and full compliance documentation from a UK manufacturer.