Discreet plaster-in and dual access solutions that protected the look of a Grade II* listed landmark while improving utility access across a mixed-use development.
At a glance
- Project: Battersea Power Station Regeneration
- Location: Circus Rd W, Nine Elms, London SW11 8DD
- Sector: Mixed-use regeneration (retail, leisure, commercial and residential)
- Requirement: Modern utility access while preserving historic architecture
- Products supplied: Plaster-In Access Panels, Dual Access Panels
- Finish / integration: Seamless integration with existing architectural detailing
- Outcome: Improved access for servicing with minimal visual impact
The brief
Battersea Power Station’s regeneration demanded modern servicing access across a wide range of internal spaces, without compromising the historic character of the building. The access solution needed to be unobtrusive, consistent with surrounding finishes, and adaptable to different utility access points across the development.
The challenges
- Historic preservation: Access points had to respect the Grade II* listed fabric and visual character.
- Architectural integrity: Panels needed to sit flush and avoid disrupting key sightlines and finishes.
- Versatility across spaces: Different areas required different access needs and configurations.
The solution
Rapid Access Ltd supplied a combination of plaster-in and dual access panels designed to integrate cleanly with the building’s architecture.
- Plaster-In Access Panels: Provided a discreet, finish-friendly solution that blended into surrounding surfaces.
- Dual Access Panels: Offered flexible access where servicing requirements varied across areas.
- Architectural harmony: Panels were selected and applied to support a consistent visual finish throughout the scheme.
Installation and delivery
The panels were installed with a focus on precision and alignment with surrounding details. The plaster-in design supported a flush finish, while dual access configurations enabled practical servicing access across multiple utility locations within the development.
The result
- Discreet access points that preserved the architectural character of a landmark building
- Practical servicing access across a wide variety of spaces
- A consistent, integrated finish that avoided visual disruption
- A solution aligned with both heritage sensitivity and modern building operations
Products used
- Plaster-In Access Panels – for flush, paint-ready access that blends into finished walls and ceilings
- Dual Access Panels – for flexible servicing access where requirements differ by area
Next step
Planning a refurbishment or heritage-sensitive project? We’ll help you specify the right access solution for a clean finish and easy servicing.
Case Studies
Battersea Power Station Regeneration
The iconic Grade II* listed Battersea Power Station is NOW OPEN as […]